CE Coiled Tubing Multi-Lateral Entry System (MLES)
The CE Coiled Tubing Multi-Lateral Entry System (MLES) with an integral Zerlux Opteye memory camera enables post-job verification of the lateral entry and the assessment of the multi-lateral junction, wellbores, fish or obstructions within the lateral.
The Opteye Multi-Lateral Entry System consists of a High Torque Indexing Tool, a Battery Sub, Hydraulic Knuckle Joint and a Camera Probe. The MLES operation is identical to the standard system with the additional benefit of flow all the way to the Opteye camera lens, to help clean the lens and aid better wellbore visibility.
FEATURES AND BENEFITS
– The Hydraulic Knuckle Joint delivers a large articulation force to ensure a reliable hole-finding operation
– The Opteye camera gives a reliable post-job visual data on the job performance, the wellbore condition and any obstructions in the well path
– The CT High Torque Indexing Tool produces high torque values to ensure the entire BHA is properly oriented each time the pump is cycled
– The Hydraulic Knuckle Joint features a variable opening M2M bleed valve to generate a large and reliable pressure indication